Lachlan’s Line Lot 104 & 105

Greenland Group engaged Northrop to provide structural, electrical, mechanical and hydraulic engineering services on a new multistorey residential block at 100 Epping Rd, Macquarie Park.

The development required seven chamber substations distributed between different buildings to manage the power supply. We needed to maximise the existing Ausgrid HV feeder to supply the new substations. The design also had to meet specific requirements of the architect and building façade.

Our team developed a good relationship with the client and builder throughout the project. We were able to complete the substation design within the required timeframe and in line with the restricted spatial requirements. The client also appreciated our ability to balance our engineering solution with the cost of construction.